
The land around Tivoli. The sports centre is not in the picture. Photo: Sergey Ashmarin, CC BY-SA 3.0, cropped.
SS Lazio Sports CentreA raised path around an unfinished complex
This sports centre design set many activities around the pool building of an unfinished complex in Tivoli, with a higher path to look over them all.
The design ran a path in a ring around an area of pools and courts. It was to be 1 to 1.5 metres higher than the path inside, so people walking along it would have looked down over the whole place.
This was a competition design for a sports centre in Tivoli, near Rome. No construction is recorded. The Olympic complex of the club SS Lazio had been left partly unfinished. The plan set out to use the existing structures better.
Many sports, many visitors
The Olympic pool building was to be renovated. Around it, the plan added football pitches and courts for basketball, beach volleyball and bocce, the Italian game of bowls. It also proposed a skate park, a climbing area, a gymnastics area, a boxing ring with training equipment, and a bar with a terrace. Children were to have their own area with a pool and games.
The place was meant to stay open 24 hours a day, with a different crowd at each time. During the day it would have suited children, parents and older people. Workers could have rested there in their lunch break. In the late afternoon and at night it was aimed more at young people. The club was private, but the grounds were also to serve the public, to meet its agreement with the city.
Slides and steps
The changes in level were to become part of the play. In the children’s area they would have formed slides running down to the pool, and soft dunes. The sunbathing terrace was to rise in steps to the south-west, turned so that parents lying there could watch children in the water.
Much of the land was to stay green, with equipment for activities along the creek. The plan also included renewable energy and returning the site to a more natural state.
The work was planned in three steps. The first covered the outdoor area around the pool. The second added an indoor restaurant, a yoga and pilates gym and a spa. The last covered entrances, parking and links to the neighbouring sports hall and stadium.
More doors to open
Vigorelli StadiumA new roof was to spill past the walls of a velodromeMilan, Italy. Competition design, no record of building
Horto CityA city grid was to turn slowly into a parkSouth Milan Agricultural Park, Milan, Italy. Competition design, no record of building
Serchio BridgeA foot and cycle bridge planned to stay over the river longerRiver Serchio, Lucca, Italy. Competition design, no record of building